Marketplace

Two ways to get the part. One place to get it.

Either the part still exists on somebody's shelf, or it has to be made. The marketplace handles both, and the criticality engine decides which one you should be doing.

Two modes

Made to order, or already in stock.

Same account, same suppliers, same order tracking. The difference is whether the part has to be manufactured.

Mode 1 — Made to order

Machining for parts that no longer exist

For obsolete components and parts with unacceptable OEM lead times. You upload the geometry; vetted machining shops quote against one complete specification.

  1. 01

    Submit the file

    Upload a STEP, STL, IGES, PDF drawing or photographs of the failed part. Add material, quantity, tolerance and the date you need it.

  2. 02

    Reverse-engineer and quote

    Where no drawing exists, we rebuild the geometry from the broken part or a scan. Vetted shops quote against one complete spec.

  3. 03

    A vetted shop makes it

    You compare price, lead time and certifications, then award. The job is manufactured to modern tolerances, not copied to old ones.

  4. 04

    Delivered and traceable

    Material certificates, dimensional records and the digital model stay with the part. The second time you need it, it is a reorder.

Request a part

Mode 2 — Obsolete & surplus stock

Listings for parts that already exist

For parts sitting unused in another plant's store. Suppliers list existing surplus and obsolete spares; buyers search, then buy now or make an offer.

  1. 01

    Suppliers list what they hold

    Part number, description, manufacturer, category, condition, quantity, price and photographs. Plants and vendors both list.

  2. 02

    Buyers search and filter

    Search by part number or manufacturer, filter by category, condition and country. Every listing is attached to a verified company.

  3. 03

    Buy now or make an offer

    Take the listed price, or open a negotiation on quantity and value. The listing owner accepts, counters or declines.

  4. 04

    Dead stock becomes a sourced part

    One plant releases capital that was standing still. Another avoids a 180-day OEM lead time. The order is tracked to delivery.

Browse surplus stock

Who sells here

Machining shops, stock holders, or both.

A CNC shop quotes made-to-order work. A plant with a full store lists what it will never fit. Many suppliers do both.

FAQ

Files, materials, condition, IP and payment.